Retrofit and expansion of existing Studio Campus to include new mission critical data centers, technical video/audio editing spaces, broadcast studios and tenant remodeling. Project included the addition of chilled water capacity to an existing distribution system to new and refurbished custom air handlers. Acoustically sensitive ductwork and piping installation as required including double wall duct construction, spring isolation and custom studio air distribution. 100 ton capacity data center cooling utilizing custom rooftop air handling, N+1 redundancy and overhead distribution. Open protocol LON DDC controls engineered and installed by Western Allied including web based graphical interface, trending and alarming.